Physical Security Upgrades — U.S. Embassy
Project Overview
The project aims to provide a safer living and working space for the American Embassy building and American embassy in Baku. The project scope includes renovation works at MCAC and North CAC buildings. Standard doors have been removed and new FE/BR doors installed for the Main CAC Building. Plastering and painting works were carried out on interior and exterior walls. Demolition, excavation and concrete works were executed around the Main CAC building. Construction of Main CAC building bollards foundations was completed prior to installation of the anti-ram wedge barrier. Electrical and telecommunication infrastructural works were also completed with the renovation of MCAC and North CAC buildings. The scope of project includes: • Installation of a new Prefabricated Guard Booth • Installation of high-security Anti-Climb Fence – 53 LM • Installation of K-12 Anti-Ram Bollards • Installation of Anti-Ram Wedge Barrier • Installation of crash rated Drop Arm Gate • Installation of FE/BR doors for the existing MCAC building • Renovation of the environmental lighting system • K-12 certification at all embassy entrance doors vehicle barriers • Renovations of existing MCAC and North CAC buildings • Rehabilitation of the existing camera environmental security system • Construction of the TSS infrastructure for new facilities including earthworks • Removal and disposal of existing pavements, drop arm gates and pedestals, concrete planter boxes, and anti-climb fence
Project Details
Location
Baku, Azerbaijan
Sector
Construction & Contracting
Project Type
Design - Build
Project Start
July 2013
Project End
May 2014
Client
U.S. Department of State, OBO